VK — PROJECT · STRUCTURAL

REINFORCED-CONCRETE
STRUCTURE.

A new reinforced-concrete shell built around an existing structure on a sloping plot — excavation, formwork, waterproofing and the floor slab, all by our own crew.

  1. Stage 1: Base preparation
    01

    Base preparation

    Excavation around the existing structure, then a gravel bed laid and compacted with a plate compactor.

  2. Stage 2: Blinding slab
    02

    Blinding slab

    A levelled blinding slab poured over the compacted base, with insulation boards fixed to the existing walls.

  3. Stage 3: Wall reinforcement
    03

    Wall reinforcement

    Steel mesh fixed over the old walls to tie the new concrete shell to the existing structure.

  4. Stage 4: Formwork
    04

    Formwork

    Panel formwork with timber walers and bracing set up around the whole structure, ready for the wall pour.

  5. Stage 5: Concrete walls & primer
    05

    Concrete walls & primer

    Formwork stripped, the new reinforced-concrete walls repaired, and the slab primed with bitumen.

  6. Stage 6: WaterproofingStage 6: Waterproofing
    06

    Waterproofing

    Torch-applied Sika bituminous membrane on the floor and up the walls, with lapped and sealed joints.

  7. Stage 7: Drainage membrane & slab rebar
    07

    Drainage membrane & slab rebar

    Dimpled drainage membrane on the walls and a two-layer rebar mesh for the floor slab.

  8. Stage 8: Slab pour
    08

    Slab pour

    The floor slab poured and levelled, with starter bars left for the next stage of the build.

← ALL PROJECTS

PLANNING A RENOVATION?

Free site visit and itemized estimate within 48 hours.

GET A QUOTE
04 — CONTACT

LET'S BUILD TOGETHER.LET'S RENOVATE
YOUR SPACE.

OFFICE

Sofia, Bulgaria

HOURS

Mon–Fri, 7:00 AM – 6:00 PM

Request a quote